MUD BUILDINGS
A DOWN TO EARTH SOLUTION FOR HOUSING PROBLEMS IN THE WORLD
mortor testing
  • Soak the blocks before applying the mortar.
  • Keep 1cm joint thickness.
  • Never fill vertical joints afterwards, apply mortar on side of the previous block.
  • Re-point the joint the same day when the mortar is still fresh

 

< < PREVIOUS
Posted by Ar. Guruprasad Rane on 28th Jan 2006. Email: