MUD BUILDINGS
A DOWN TO EARTH SOLUTION FOR HOUSING PROBLEMS IN THE WORLD
mortor testing

procedure

  • Start with a mix of 1 vol. cement + 6 vol. soil + 6 vol. sand.
  • Apply a layer of 1cm mortar on a block soaked in water and let it dray in shade.
  • Observe the mortar for cracks.

interpretation

  • If cracks appear, reduce the soil and increase the sand proportion.
    1 Cement + 5 Soil + 7 Sand.
  • If mortar is too crumbly, increase the soil and reduce the sand proportion.
    1 Cement + 7 Soil + 5 Sand
< < PREVIOUS
Posted by Ar. Guruprasad Rane on 28th Jan 2006. Email: